Oracle Manufacturing Scheduling will Quickly and Graphically Answer the Following Questions for Shop Floor Personnel:
- What jobs are scheduled today?
- In what order are the jobs scheduled to be completed?
- When is a particular operation on a job scheduled to start?
- What resources are assigned to any given job or operation?
- What are the properties of the job and resources?
- How can I optimally schedule my jobs based on available resources and components?
- I have a resource shortage (machine breakdown, employee sick), what operations and jobs are affected?
- Do I have any overloaded resources today? If so, for which operations?
- How can I optimally reschedule my jobs when I realize a resource or component constraint?

Shop floor personnel can easily view and "drag and drop" reschedule jobs, operations, and resources.
Manufacturing Scheduling Workbench
A visual display of jobs, operations, and resources via an advanced graphical interface allows you to view your entire shop floor in one instance, complete with resource load versus capacity graphs. Coupled with interactive "drag and drop" rescheduling capability, you can now view and easily reschedule jobs, operations, and resources.
The Manufacturing Scheduling Workbench is a highly effective tool for you to quickly address changes as a result of unforeseen circumstances, such as material or other resource shortages; or simply to maintain an optimal schedule to efficiently utilize resources and maximize shop floor productivity. Any rescheduling is åwhat-if" until you save the new schedule.
"Drag and Drop" Reschedule Jobs, Operations, and Resources
The Manufacturing Scheduling Workbench includes a visual display (Gantt chart) of jobs that allows you to view activity on your shop floor over time. The advanced graphical interface allows you to view, and "drag and drop" reschedule a particular job or operation based on resource and/or component constraints.
Resource Load vs. Capacity Graph and Table
You can choose between a graph or table to view the resource load versus available capacity. The resource load display (required hours versus available hours) is positioned directly under the Gantt chart and shares the same bucketed timeline.
Automatically Reschedule Jobs or Operations based on Constraints
You can use constraint-based scheduling to compute the optimal start and end dates for a job or job operation that you drag from one position on the Gantt chart to another position. For example, if you drag a job operation from one day to another, the constraint-based scheduler will automatically position it at an optimal time when there are resources and/or material available to work on it. You can choose to have the constraint-based scheduler either forward, forward midpoint, midpoint, or backward reschedule the selected job or job operation that you drag.
Manually Reschedule Jobs, Operations, or Resources
You can also use manual scheduling to reschedule jobs or operations by dragging them to any location on the timeline. You can click and drag the beginning or end of a job/operation to extend or shorten the duration of the job or operation. As with automatic scheduling, you can save your changes when you are satisfied with them.
Automatically Reschedule All Jobs
You can use the manufacturing scheduler to optimally reschedule all jobs based on resource and component constraints. You can reschedule all jobs on the shop floor at any time.
Scheduling Support for ATO (Assemble-to-Order) and Imported Jobs
You can create your assemble-to-order jobs (discrete jobs) with pending scheduling status. At your discretion, the manufacturing scheduler will reorganize the job schedule with optimal dates based on overall resource and component constraints. For imported jobs, you can optionally use constraint-based scheduling to compute the optimal start and end dates.
Oracle E-Business Suite--The Total Solution
Transform the way you conduct business with Oracle's internet-enabled e-business suite. Put your demand chain, supply chain, and internal operations online with Oracle's comprehensive and fully integrated solution. Combine the wide reach of the internet with Oracle's fully globalized product to run your business consistently and accurately worldwide. Reduce costs and complexity by running on corporate internets or the World Wide Web.
As a provider of global consulting, education, and support services, Oracle provides the most complete e-business solution available.
The Oracle E-Business Suite: transforming your business into an e-business
|
KEY FEATURES |
|
Flexible Advanced Graphical User Interface to Customize Your Shop Floor Viewing Requirements
- Full åDrag and Drop' and åPoint and Click' user functionality
Reschedule Jobs and Operations
Expand and Collapse Jobs, Operations, and Resources on Graphical Job Tree
Resize panes
Access all menus and functions
- Filter out only the jobs you want to view using any combination of filter criteria
Department
Without Dispatch Consideration
Immediate Dispatch
Upstream Dispatch
Resource
Without Dispatch Consideration
Immediate Dispatch
Upstream Dispatch
Specific Job
Assembly
Components Used
Job Status
Released
Unreleased
Hold
Complete Charges
Complete No Charges
- Configure bucket size to meet your needs
Month
Day
Hour
30 minutes
15 minutes
Buckets are further scaleable using variable bucket sizing contro
- Graphically View Resources and Resource Load Capacity for specific resources
Table View
Continuous Load View
Bar Graph View
- Quickly View Detailed Properties of any Job, Operation or Resource
Job Properties
Job Name
Job Description
Assembly
Assembly Description
Status
Firm FlagStarting Time
Ending Time
Quantity
Bill Revision
Routing Revision
Demand Class
KanBan
Schedule Group
Line
Task
Operation Properties
Code
Start Date
End Date
Operation Description
Queue Quantity
Run Quantity
To Move Quantity
Reject Quantity
Scrap Quantity
Complete Quantity
Backflush
Minimum Transfer Quantity
Date Last Moved
Resource Properties
Resource Name
Resource Description
Start Date
Assigned Units
UOM
Basis Type
|
Automatically Reschedule Jobs and Operations
- From WIP forms or from the Manufacturing Scheduling Workbench
- One at a time or the entire shop floor
- Forward and Backward Reschedule Jobs
- Midpoint and Forward Midpoint Reschedule Operations
- Schedule as you create jobs or schedule jobs at a later time
Manually Reschedule Jobs and Operations
- From the WIP Reschedule form
From the Manufacturing Scheduling Workbench
åDrag and Drop' or type in the start and end dates with the Edit window
|
|