Oracle Customer Success — Colorado Department of Transportation (CDOT)

Colorado Department of Transportation (CDOT)

50-70% Faster to Respond to Colorado Open Records Act (CORA) Requests

Share
 

I am constantly going back to reference Aconex now that US 36 is in the operations and maintenance phase.

— Anthony Meneghetti, P.E. HPTE Major Projects Manager, Colorado Department of Transportation

Project name: Colorado Department of Transportation (CDOT)
Industry: Road & Rail
Project size: US$500 million 
Location: Colorado, USA
 
CDOT and the High Performance Transportation Enterprise (HPTE), an independent, government-owned business, are engaged in multiple highway infrastructure projects, including the US 36 Express Lanes, I-25 North, I-70 East, and C-470. These projects fall under the HPTE’s mandate to pursue more efficient ways of financing infrastructure projects, such as public private partnerships (P3), design-build contracting and other methods of alternative delivery.
 
Challenges
  • State mandate for project records management and systematic processes for managing all aspects of P3 projects
  • Limitations of enterprise file-sharing software for large engineering documents and cross organization review cycles
  • Managing a project impacting a currently used major public highway
  • Taking a 30-year view into the operations of their concession to operate and maintain Central 70, the largest transportation project the state has undertaken
Results
  • Project-wide platform that provides transparency
  • Proven industry specific configurable system to meet specific project requirements
  • Robust information management to reduce errors and delays on a highly visible project
  • Complete and accessible project record referenceable throughout the life of the project
  • Colorado Open Records Act (CORA) requests took days to prepare and respond to. Now, with Aconex, it takes just hours. A 50-70% time savings
  • By having all RFIs located in one place –in Aconex, reviews can occur simultaneously and review times have improved by about 20%
  • The need for 1-2 full time equivalent project engineers or administrators to track documents and drawings through review cycles has been eliminated by using Aconex
  • Cross organization communication has been sped up using Aconex and is an estimated 15% faster than before
  • It is 60% faster to search for and locate documents using Aconex

About Colorado Department of Transportation (CDOT)

Headquarters

 
Colorado, USA
This story was originally published on www.aconex.com.
Published:  Jun 26, 2018