This illustration shows the top part of the Sprint Report tab of the Reports view, which contains a chart slightly different from the Burndown chart. The horizontal axis is by day, and the vertical axis is in story points. The diagonal line from the start to end date of the sprint provides a guideline that shows the expected total story points for all open issues at the end of each day. One line with a dot shows the progress of the one story point that has been assigned. Vertical dotted lines show the start and end dates of the sprint, and a horizontal dotted line shows the sprint capacity. Below the chart is a text description of the sprint: "Active sprint owned by Alex Admin in board My Board and using search ALL from board My Board", followed by the start and end date and time, the duration of the sprint in days, and the number of working days in the sprint.